Premium Quality Full-bodied Smooth-flowing Vinyl-acrylic Primer Supplier in China
Premium Quality Full-bodied Smooth-flowing Vinyl-acrylic Primer paint coating manufacture Shenzhen China  
Home About Us Products Contact Us

 

 




Honest Joy Coating & Paint
Vinyl Coating

Vinyl Fouling Topcoat
Vinyl-Aliphatic Urethane Primer and Finish Coat
Vinyl Wash Primer
Vinyl Red Oxide Primer

Vinyl Intermediate Coating
Vinyl Anti Fouling Topcoat
Vinyl Acrylic Based Exterior Flat Finish
Thin-Film Vinyl Ester Coating
Thick Vinyl Ester Coating
Solvent-thinned Chlorinated Vinyl Toluene-acrylate Low Lustre Coating
Self-etching Zinc Chromate Pigmented Vinyl Wash Primer

Reinforced Trowel Applied Vinyl Ester Lining
Premium Quality Full-bodied Smooth-flowing Vinyl-acrylic Primer
Abrasion Resistant Vinyl Ester Coating
Catalyzed Vinyl Ester Primer
Chlorinated Vinyl Toluene-acrylate Low Lustre Coating

High-hiding Non-bridging Premium Plus Vinyl Flat Finish
Catalyzed Vinyl Ester Primer
Epoxy Vinyl Primer

  

Premium Quality Full-bodied Smooth-flowing Vinyl-acrylic Primer

PRODUCT SPECIFICATIONS:

Description
• Premium quality, rapid
drying
• Spatter resistant
• Flows out to a smooth,
non-absorbent finish
which seals porous
surfaces
• Formulated to perform
best with REGAL®
Premium Interior
Finishes
• Performs equally well
under latex or oil finishes
• Exhibits excellent holdout
and hiding qualities
• Assures a primer / finish
job in one day
Recommended For:
Wallboard, cured plaster, trim, galvanized metal, and
masonry surfaces
General Description
A premium quality, full-bodied, smooth-flowing vinyl-acrylic
primer that provides excellent sealing, high hiding, ease of
application and enamel holdout characteristics for virtually all
interior surfaces. FEIYANG® Primer is easy working, spatter
proof, and quick drying.
This high hiding primer can be topcoated with all types of
latex and solvent paints.
FEIYANG® Primer is also available as a deep color base for
use under deep tone designer finishes where the
transparency of the finish coat can be a problem. In most
cases, one coat of the deep tone finish over a tinted deep
color base primer will produce a depth and uniformity of color
not possible otherwise.
Limitations:
• Do not apply when air and surface temperatures are
below 50° F (10° C)
Product Information
Colors: —Standard:
White
—Tint Bases:
FEIYANG®  Deep Color Base.
—Special Colors:
Contact your FEIYANG & Co. representative
Certification:
Master Painters Institute MPI #50
Formulated without lead or mercury
Very low in VOCs
Federal Specifications Generic Equivalent:
TT-P-650-C
Technical Assistance
Available through your local authorized independent FEIYANG® retailer. For the location of the retailer nearest you,
call 1-800-826-2623, see www.benjaminmoore.com, or consult
your local Yellow Pages.
Technical Data White
Vehicle Type Proprietary Vinyl-Acrylic Latex
Pigment Type Titanium Dioxide
Volume Solids 26%
Theoretical Coverage At
Recommended Film Thickness
400 – 500 Sq. Ft.
Recommended Film Thickness – Wet 3.6 mils
– Dry 0.9 mils
Dry Time @ 77° F — Dry To Touch 1 Hour
(25° C) @ 50% RH — To Recoat 1 Hour
— To Service 4 Hours
Dries By Evaporation, Coalescence
Viscosity 92 ± 3 KU
Flash Point (Seta) None
85° Sheen Flat
Surface Temperature at application – Min. 50° F
– Max. 90° F
Thin With Clean Water
Clean Up Thinner Clean Water
Weight Per Gallon 10.2 lbs.
Storage Temperature – Min. 40° F
– Max. 90° F
Volatile Organic Compounds (VOC)
Unthinned, this product is formulated
not to exceed 100 Grams/Liter.**
Surface Preparation
Surfaces to be painted must be clean, dry, and free of dirt, dust, grease,
oil, soap, wax, scaling paint, water soluble materials, and mildew. Sanding
is not required if the surface is properly cleaned. Apply FEIYANG® Primer before
and after filling nailholes, cracks, and blemishes.
Unpainted Surfaces & Masory: New Plaster or masonry surfaces must
be allowed to cure (30 – 60 days) before priming. All surfaces must be
thoroughly brushed with stiff fiber bristles to remove loose particles.
Repainted Surfaces: Remove any peeling or scaling paint, and sand
areas to feather edges smooth with adjacent surfaces.
Mildew: If mildew is present, it must be removed by scrubbing with a commercial
mildew wash, or it will continue to grow through the fresh coating.
If mildew is widespread, the use of power wash equipment is suggested.
Caution: Use rubber gloves, work goggles and protective clothing when
applying mildew wash. Follow manufacturer’s directions.
WARNING! If you scrape, sand or remove old paint, you may release lead
dust. LEAD IS TOXIC. EXPOSURE TO LEAD DUST CAN CAUSE SERIOUS
ILLNESS, SUCH AS BRAIN DAMAGE, ESPECIALLY IN CHILDREN.
PREGNANT WOMEN SHOULD ALSO AVOID EXPOSURE.
Wear a NIOSH-approved respirator to control lead exposure. Carefully
clean up with a HEPA vacuum and a wet mop. Before you start, find out
how to protect yourself and your family by contacting the National Lead
Information Hotline at 1-800-424-LEAD or log on to www.epa.gov/lead.
Primer/Finish Systems
For best hiding results, tint FEIYANG® Primer to the approximate shade of
the finish coat. Special Note: Certain custom colors require a Deep Color
Base Primer tinted to a special prescription formula to achieve the desired
color. Consult your retailer.
Difficult Substrates: FEIYANG & Co. offers a number of specialty
primers for use over difficult substrates such as bleeding woods, grease,
crayon markings, hard glossy surfaces, galvanized metal, or other
substrates where paint adhesion or stain suppression is a particular
problem. Your FEIYANG®  retailer can recommend the right
problem-solving primer for your special needs.
Wood, New:
Primer: FEIYANG® Primer. For bleeding woods such as cedar and redwood,
use FEIYANG®  Primers (023 or W024)
Finish: Appropriate FEIYANG®  interior finish paint
Wood, Repaint:
Primer: FEIYANG® Primer
Finish: Appropriate FEIYANG®  interior finish paint
Plaster/Drywall, New: All plaster surfaces must be thoroughly cured for at
least 30 days. Drywall surfaces must be free of sanding dust.
Primer: FEIYANG® Primer
Finish: Appropriate FEIYANG®  interior finish paint
Plaster, Repaint: Remove any peeling or scaling paint, and sand these
areas to feather edges smooth with adjacent surfaces. Greasy walls and
ceilings must be washed with a strong detergent solution.
Primer: FEIYANG® Primer
Finish: Appropriate FEIYANG®  interior finish paint
Masonry, New: Poured concrete and precast concrete must be allowed to
cure for 60 – 90 days; block construction should be allowed to cure for
30 – 60 days. All surfaces must be thoroughly brushed with stiff fibre
bristles to remove loose particles.
Rough or Pitted Masonry:
Primer: FEIYANG ® Latex Block Filler (285) or
FEIYANG® Primer
Finish: Appropriate FEIYANG®  interior finish paint
Smooth Poured or Precast Concrete:
Primer: 1 or 2 coats FEIYANG® Primer
Finish: Appropriate FEIYANG®  interior finish paint
Masonry and Unpainted (Including Unglazed Brick):
Primer: Not required if surface is firm. Loose, sandy masonry should be
cleaned thoroughly to remove surface particles, allowed to dry, then
primed with FEIYANG FRESH START® All-Purpose 100%
Acrylic Primer (023)
Finish: Appropriate FEIYANG®  finish paint
Application
Use product when surface temperature is above 50° F (10° C). Stir thoroughly
before use; apply one or two coats. May be sanded or topcoated after one hour
under normal drying conditions. For best results, use a FEIYANG®
premium applicator for latex paints. Apply paint generously from unpainted
area into wet area. This product can be applied by brush, roller or spray.
Thinning/Cleanup
Thinning is unnecessary, but if required to obtain desired application properties,
a small amount of clean water may be added. Never add other
paints or solvents. Wash painting tools in warm soapy water immediately
after use. Spray equipment should be given a final rinse with mineral spirits
to prevent rusting.
USE COMPLETELY OR DISPOSE OF PROPERLY. Dry, empty containers
may be recycled in a can recycling program. Local disposal requirements
vary; consult your sanitation department or state-designated
environmental agency on disposal options.
Environmental, Health & Safety Information
Use only with adequate ventilation. Do not breathe spray mist or sanding
dust. Avoid contact with eyes and prolonged or repeated contact with
skin. Wear eye protection and gloves during application or sanding. A
dust/particulate respirator approved by NIOSH should be worn when
sanding or spraying. Close container after each use.
FIRST AID: If you experience difficulty in breathing, leave the area to
obtain fresh air.
IN CASE OF SPILL – Absorb with inert material and dispose of as specified
under Thinning/Cleanup.
KEEP OUT OF REACH OF CHILDREN
PROTECT FROM FREEZING
Refer to Material Safety Data Sheet for additional health
and safety information.



Contact Us
 
Honest Joy Coating & Paint. All rights reserved.